Moss Drill
Date:
Tue, 30/05/2023
Stayed in Marina and carried out all MOSS drills, 28 to 35knot NW heavy rain squalls.
Man Overboard, Firefighting, Structural Breach and Collision, Grounding, Abandon Ship, Medical Emergency, Loss of Power, Loss of Steering, Pollution Control, Capsize and anchoring.
Anchored in Marina, undertook all Moss drills and various senarios in each
Undertook drills in Phoenix
Turnout:
5 people
Total Volunteer Hours:
15