repack MR1 as CRV fam
Date:
Thu, 08/11/2018
MR1 was put back in water and we peplaced all of the esential gear as per MOSS manual, inventoried the tool kit and reviewed the changes made to switchboards and lights etc. Trevor B gave a run down of all of the maintenance issues covered in the time off water.
We then had a look at another IMT scenario of a real life incident
Turnout:
7 people
Total Volunteer Hours:
17.5